31 Jan, 2024 |
1 Feb, 2024 at
10:00 AM
|
11 Mar, 2024 at
03:00 PM
|
01/SE(R)/e-Tender/2023-24 |
Supply, Installation testing & commissioning of Data Acquisition and Post Processing Software for Echosounder (Make:SyQuest, Model: Bathy500DF) & SIMRAD MX510 Navigation System (GPS) |
Superintending Engineer
Research Circle
Irrigation Research Institute, Roorkee info@iriroorkee.res.in |
|
12 Dec, 2023 |
12 Dec, 2023 at
10:00 AM
|
3 Jan, 2024 at
03:00 PM
|
07/Highway/Quotation/2023-24 |
Regarding Calibration of Machine/Equipment as per given in Annexure. |
Assistant Research Officer,
Highway Laboratory
Basic Research Unit, IRI, Roorkee highwaylab2015@gmail.com |
|
1 Dec, 2023 |
1 Dec, 2023 at
10:00 AM
|
21 Dec, 2023 at
03:00 PM
|
132/Highway/Quotation |
Supply of Cannon-Manning Vacuums Viscometer, BS U Tube Modified Reverse Flow Viscometer & Silicon Oil as mention in Quotation. |
Assistant Engineer, Highway Laboratory, Basic Research Unit
Irrigation Research Institute, Roorkee highwaylab2015@gmail.com |
|
6 Oct, 2023 |
6 Oct, 2023 at
10:00 PM
|
25 Oct, 2023 at
03:30 PM
|
1754/ प्र0 ख0 |
Regarding Auction of 360 Batteries of Solar Panel |
Executive Engineer
Administration Division
Irrigation Research Institute, Roorkee eeadminrke@@iriroorkee.res.in |
|
9 Aug, 2023 |
9 Aug, 2023 at
10:00 AM
|
25 Aug, 2023 at
03:00 AM
|
01/प0इ0-4/2022-23 |
Consultancy work for the preparation of Interim Report & Final Report of State Specific Action Plan (SSAP) for Uttarakhand state under National Water Mission, New Delhi
I. Data collection from all Water Stakeholder Departments falling in Uttarakhand.
II. Preparation of Water Budget of various major structures & for basin/sub-basin/district/block level and future projections till year 2050
lII. Preparation of GIS maps of all collected data |
Executive Engineer, Design Unit-4
Irrigation Design Organization, Roorkee info@iriroorkee.res.in |
|
10 Jul, 2023 |
10 Jul, 2023 at
10:00 AM
|
1 Aug, 2023 at
03:00 PM
|
12/RFQ/AE/SPMU/2023-24 |
Painting & Marking of Gauge Post on Bridge Piers in identified location in Uttarakhand State under National Hydrology Project. |
Office of Assistant Engineer,
State Project Monitoring Unit,
National Hydrology Project, Roorkee-247667 uttarkhandwrd@gmail.com |
|
23 May, 2023 |
23 May, 2023 at
10:00 AM
|
23 Jun, 2023 at
03:00 PM
|
01/RFQ/PO-1/SPMU/2023 |
Providing Services for Generation of GPS Database for canal system in Uttarakhand for the creation of SWRIS under National HYdrology Project. |
Executive Engineer
SPMU, National Hydrology Project
Irrigation Research Institute, Roorkee-247667 uttarkhandwrd@gmail.com |
|
3 Feb, 2023 |
18 Feb, 2023 at
03:00 PM
|
25 Feb, 2023 at
03:00 PM
|
06/SE(R)/e-Tender/2022-23, Dated 03-02-2023 |
Preparation of Detailed Project Report (DPR) for Comprehensive Geological Investigation and Preparation of Drainage Plan for the Sustainable Safety of Gopeshwar and Karnprayag Towns, Chamoli, Uttarakhand. |
Superintending Engineer, Research Circle, Irrigation Research Institute, Roorkee-247667 uttarakhandwrd@gmail.com |
|
4 Jan, 2023 |
4 Jan, 2023 at
01:00 AM
|
18 Jan, 2023 at
01:00 AM
|
01/CC/Quotation/2023-24 |
Repairing of APC 5KV (192 Volt DC) online UPS |
Assistant Research Officer-1, Computer Centre, Basic Research Unit,
Irrigation Research Institute, Roorkee-247667 info@iriroorkee.res.in |
|
29 Dec, 2022 |
29 Dec, 2022 at
10:00 AM
|
12 Jan, 2023 at
03:00 PM
|
03/CC/Quotation/2022-23 |
Creating Documentary of Irrigation Department, Uttarakhand |
Assistant Research Officer-1, Computer Centre, Basic Research Unit, Irrigation Research Institute, Roorkee- 247667 info@iriroorkee.res.in |
|
2 Jan, 2023 |
10 Jan, 2023 at
03:30 PM
|
18 Jan, 2023 at
03:00 PM
|
01/EE/ADMIN/e-Tender/2022-23 |
Renovation of Workshop Builiding in Right Bank of Canal at IRI Roorkee for NCC Office. |
Execuitive Engineer, Administation Division
Irrigation Research Institute, Roorkee eeadmin@iriroorkee.res.in |
|
1 Dec, 2022 |
1 Dec, 2022 at
10:00 AM
|
15 Dec, 2022 at
03:00 PM
|
02/CC/Quotation/2022-23 |
Making Documentary of Irrigation Research Institute, Roorkee with audio recording, mixing of video and pictures with animations. |
Assistant Engineer-1
Basic Research Unit
IRI, Roorkee info@iriroorkee.res.in |
|
20 Oct, 2022 |
22 Oct, 2022 at
03:00 PM
|
10 Nov, 2022 at
03:00 PM
|
02/SE(R)/e-Tender/2022-23 |
Invitation of online Expression of interest for engaging Consulting Services for the Preparation of Detailed Project Report (DPR) for Comprehensive Geological Investigations & Preparation of Drainage Plan for the Sustainable safety of Joshimath Town, Chamoli, Uttarakhand. |
Superintending Engineer
Research Circle
IRI, Roorkee. uttarkhandwrd@gmail.com |
|
31 Aug, 2022 |
31 Aug, 2022 at
10:00 AM
|
14 Sep, 2022 at
03:00 PM
|
01/CC/Quotation/2022-23 |
Making Documentary of Irrigation Research Institute, Roorkee |
Assistant Research Officer-1
Basic Research Unit
IRI, Roorkee info@iriroorkee.res.in |
|
5 Aug, 2022 |
5 Aug, 2022 at
10:00 AM
|
20 Aug, 2022 at
03:00 PM
|
02/Highway/Quotation/2022-2023 |
For the Calibrations of instruments/Machines/Apparatus of Various Laboratories of Irrigation Research Institute Roorkee as per attached Annexures. |
Assistant Engineer
Highway Laboratory, Basic Research Unit
IRI, Roorkee highwaylab2015@gmail.com |
|
6 Aug, 2022 |
6 Aug, 2022 at
10:00 AM
|
23 Aug, 2022 at
10:00 AM
|
1357/ADM Div./Disposable Vehicle/Auction |
Auction for Disposable Vehicle as per Annexures |
Executive Engineer
Administration Division
IRI, Roorkee eeadmin@iriroorkee.res.in |
|
18 Jul, 2022 |
10 Aug, 2022 at
03:00 PM
|
10 Aug, 2022 at
03:30 PM
|
01/RFQ/EE/PO-1/SPMU/2022-23 |
Fabrication and installation of 1 nos. Electrical Rotary Winch 360° (2 Nos.) including all necessary arrangements. (eg. Rope, bridge assembly) for operating whole machinery in river cross section as per specifications |
Executive Engineer,
State Project Monitoring Unit,
National Hydrology Project,
Roorkee- 247667 uttarkhandwrd@gmail.com |
|
11 Jul, 2022 |
11 Jul, 2022 at
10:00 AM
|
12 Aug, 2022 at
03:00 PM
|
31/AE-3/Q.N./2022-23 |
Supplying and Fixing of Three Edge Bearing Test Apparatus set up with having capacity of 50 Ton for NP4 concrete pipes as per code No IS 458 specification, terms and and condition accordingly.(Pipe dia 80mm to 1400 mm.) |
Executive Engineer
Administration Division
Irrigation Research Institute, Roorkee ae55.adm@gmail.com |
|
25 Jun, 2022 |
6 Jul, 2022 at
03:29 PM
|
16 Jul, 2022 at
03:00 PM
|
01/EE/SPMU/NHP/Tender/2022-23 |
Supply and Fixing of 2 nos. vehicle mounted articulated stiff telescopic boom crane assembly on Tata Yodha Utility vehicle for the operation of Acoustic Doppler Current Profiler (ADCP) under NHP as per Annexure. |
Executive Engineer
SPMU, NHP
IRI, Roorkee uttarkhandwrd@gmail.com |
|
17 Jun, 2022 |
7 Jul, 2022 at
03:30 PM
|
18 Jul, 2022 at
03:00 PM
|
01/SE(R) NHP/e-Tender/2022-23 |
Supply and Installation of Echo Sounder in Uttarakhand under National Hydrology Project |
Superintending Engineer, Research Circle, Irrigation research Institute, Roorkee uttarkhandwrd@gmail.com |
|
28 May, 2022 |
28 May, 2022 at
10:00 AM
|
28 Jun, 2022 at
03:00 PM
|
3/EE/PO-2SPMU/2022-23 |
supply and installation of Electronic Private Automatic Branch Exchange (EPABX) system & It’s accessories in SWIC Building, Roorkee under National Hydrology Project (NHP) for the goods given in Annexure. |
Office of the Executive Engineer
(Procurement Officer-2)
State Project Monitoring Unit
National Hydrology Project, Roorkee- 247667 uttarkhandwrd@gmail.com |
|
28 May, 2022 |
28 May, 2022 at
10:00 AM
|
28 Jun, 2022 at
03:00 PM
|
2/EE/PO-2SPMU/2022-23 |
supply and installation of solar power system equipment & It’s
accessories in SWIC Building, Roorkee under National Hydrology Project (NHP) for the
goods given in Annexure. |
Office of the Executive Engineer
(Procurement Officer-2)
State Project Monitoring Unit
National Hydrology Project, Roorkee- 247667 uttarkhandwrd@gmail.com |
|
28 May, 2022 |
28 May, 2022 at
10:00 AM
|
15 Jun, 2022 at
03:00 PM
|
896/Administration Division/NABL Calibration/Q.N./2022-23 |
Quotations are invited for the calibrations of instruments and apparatus at IRI Labs given in Annexure. |
Executive Engineer
Administration Division
IRI, Roorkee eeadmin@iriroorkee.res.in |
|
16 Mar, 2022 |
26 Mar, 2022 at
10:00 AM
|
29 Mar, 2022 at
11:00 AM
|
461/Adm.Div/Auction |
Auction for the items of T&P IRI, Roorkee as per given in Annexure. |
Executive Engineer, Administration Division
IRI, Roorkee eeadmin@iriroorkee.res.in |
|
22 Jan, 2022 |
22 Jan, 2022 at
10:00 AM
|
31 Jan, 2022 at
03:30 PM
|
168/Adm.Div. |
Supply of Chair Revolving- Medium Back Deluxe Cushioned (Make-Alfa 1299) |
Executive Engineer
Administration Division
IRI Roorkee eeadmin@iriroorkee.res.in |
|
17 Jan, 2022 |
17 Jan, 2022 at
10:00 PM
|
18 Jan, 2022 at
05:00 PM
|
125/Adm Div., 17-01-2022 |
Regarding Postpone of Auction no. 04 & 05. |
Executive Engineer
Administration Division
IRI Roorkee eeadmin@iriroorkee.res.in |
|
6 Jan, 2022 |
26 Jan, 2022 at
03:30 PM
|
7 Feb, 2022 at
03:00 PM
|
07/SE(R)/NHP/e-Tender/2021-22 |
Supply, Installation, Testing, Commissioning, Training, Maintenance, Electrification and Automation with SCADA System including Renovation, Furnishing of existing Barrage Control Room at Gaula, Barrage, Haldwani, Uttarakhand Under National Hydrology |
Office of the Superintending Engineer, Research Circle, IRI, Roorkee
uttarkhandwrd@gmail.com |
|
6 Jan, 2022 |
26 Jan, 2022 at
04:00 PM
|
7 Feb, 2022 at
03:30 PM
|
08/SE(R)/NHP/e-Tender/2021-22 |
Supply, Installation, Testing, Commissioning, Training, Maintenance, Electrification, Automation with SCADA System including Renovation and Furnishing of existing Barrage Control Room at Ramnagar Barrage, Uttarakhand Under National Hydrology Project |
Office of the Superintending Engineer, Research Circle, IRI, Roorkee uttarkhandwrd@gmail.com |
|
15 Dec, 2021 |
15 Dec, 2021 at
03:00 PM
|
27 Dec, 2021 at
03:00 PM
|
RFQ No. 01/PO-1/SPMU/NHP/2021-22 |
Leakage Study and Strength of Bhimtal Dam by conducting Electrical Resistivity Test (ERT), Seismic Resistivity Test (SRT) and MASW including preparation of report. Salient feature of Dam attached in Annexure-1 |
Executive Engineer (Procurement Officer-1)
SPMU,NHP
Irrigation Research Institute, Roorkee-247667 uttarkhandwrd@gmail.com |
|
16 Dec, 2021 |
16 Dec, 2021 at
10:00 AM
|
10 Jan, 2022 at
11:00 AM
|
04/Adm. Div/Disposable Vehicle/Auction |
Auction of Disposable Vehicle as per given in Annexure. |
Executive Engineer, Administration Division, IRI Roorkee eeadmin@iriroorkee.res.in |
|
16 Dec, 2021 |
16 Dec, 2021 at
10:00 PM
|
10 Jan, 2022 at
11:00 AM
|
05/Adm. Div/Disposable T&P/Machine/Auction |
Auction of Iron, Copper & Tin Scrap |
Executive Engineer, Administration Division, IRI Roorkee eeadmin@iriroorkee.res.in |
|
3 Dec, 2021 |
3 Dec, 2021 at
10:00 AM
|
18 Dec, 2021 at
03:00 PM
|
01/RCC/Quotation/2021-22 |
Supply of items as per specifications given in Annexure. |
Assistant Engineer-IV
Material Testing Unit-1, Irrigation Research Institute, Roorkee info@iriroorkee.res.in |
|
29 Nov, 2021 |
30 Nov, 2021 at
05:00 PM
|
30 Dec, 2021 at
01:03 PM
|
06/SE(R)/NHP/e-Tender/2021-22 |
Supply& Installation of Furniture in SWIC Building at Roorkee under National Hydrology Project (NHP) |
Superintending Engineer, Research Circle, IRI, Roorkee uttarkhandwrd@gmail.com |
|
29 Oct, 2021 |
29 Oct, 2021 at
10:00 AM
|
7 Nov, 2021 at
03:00 PM
|
386/Sub-Division-IIIrd/Administration Division.Q.N..2021-22 |
Supply of following item given in attached Annexure.
|
Executive Engineer Administration Division
IRI, Roorkee ae55.adm@gmail.com
|
|
29 Oct, 2021 |
29 Oct, 2021 at
10:00 AM
|
7 Nov, 2021 at
03:00 PM
|
385/Sub-Division-IIIrd/Administration Division.Q.N..2021-22 |
Supply of following item given in attached Annexure. |
Executive Engineer Administration Division
IRI, Roorkee ae55.adm@gmail.com
|
|
29 Oct, 2021 |
29 Oct, 2021 at
09:00 AM
|
7 Nov, 2021 at
03:00 PM
|
384/Sub-Division-IIIrd/Administration Division.Q.N..2021-22 |
Supply of following item given in attached Annexure. |
Executive Engineer Administration Division
IRI, Roorkee ae55.adm@gmail.com |
|
27 Oct, 2021 |
29 Oct, 2021 at
12:00 PM
|
29 Nov, 2021 at
03:00 PM
|
05/SE(R)/NHP/e-Tender/2021-22 |
Supply, Installation, Testing, Commissioning and Maintenance of Digital Water Level Recorder (DWLRs) (Non-vented Pressure sensors) with Telemetry System in Piezometer for Ground Water Monitoring and Integrated with State Water Informatics Centre located at Roorkee under National Hydrology Project(NHP) in Uttarakhand State.
|
Office of Superintending Engineer, Research Circle, Irrigation Research Institute Roorkee uttarkhandwrd@gmail.com |
|
29 Oct, 2021 |
29 Oct, 2021 at
10:00 AM
|
26 Nov, 2021 at
11:00 AM
|
03/Adm. Div./Disposable T&P/Machine /Auction |
Regarding auction of disposable items as given in Annexure. |
Executive Engineer. Administrative Division. Irrigation Research Institute. Roorkee. eeadmin@iriroorkee.res.in |
|
29 Oct, 2021 |
29 Oct, 2021 at
10:00 AM
|
17 Nov, 2021 at
10:00 AM
|
02/Adm. Div./Disposable Vehicle/Auction |
Regarding Auction of disposable vehicle as given in Annexure-1. |
Executive Engineer. Administrative Division. Irrigation Research Institute. Roorkee.
eeadmin@iriroorkee.res.in |
|
18 Oct, 2021 |
18 Oct, 2021 at
10:00 AM
|
1 Nov, 2021 at
03:00 PM
|
378/Sub-Division-IIIrd/Adminisatration Division/Q.N./2021-22 |
Supply of Shearing Machine 2' operated by Foot at IRI Roorkee |
Executive Engineer, Administration Division IRI, Roorkee
ae5.adm@gmail.com |
|
18 Oct, 2021 |
18 Oct, 2021 at
10:00 AM
|
1 Nov, 2021 at
03:00 PM
|
377/Sub-Division-IIIrd/Adminisatration Division/Q.N./2021-22 |
Supply of Oven Digital 18x18x18 make As per IS code:101 at IRI Roorkee |
Executive Engineer, Administration Division IRI, Roorkee
ae5.adm@gmail.com |
|
18 Oct, 2021 |
18 Oct, 2021 at
10:00 AM
|
1 Nov, 2021 at
03:00 PM
|
376/Sub-Division-IIIrd/Adminisatration Division/Q.N./2021-22 |
Supply of Micrometer 0-25mm mitutoyo make As per IS code:101 at IRI Roorkee |
Executive Engineer, Administration Division IRI, Roorkee
ae5.adm@gmail.com
|
|
18 Oct, 2021 |
18 Oct, 2021 at
10:00 AM
|
1 Nov, 2021 at
01:03 PM
|
375/Sub-Division-IIIrd/Adminisatration Division/Q.N./2021-22 |
Supply of Weighing Sclae 300gm Least count 0.001 gm kerro make As per IS code:101 at IRI Roorkee |
Executive Engineer, Administration Division
IRI, Roorkee ae5.adm@gmail.com |
|
22 Sep, 2021 |
22 Sep, 2021 at
10:00 AM
|
22 Oct, 2021 at
11:00 AM
|
01/Adm. Div./Disposable Vehicle/Auction |
Regarding Auction of disposable vehicle as given in Annexure-1. |
Executive Engineer. Administrative Division. Irrigation Research Institute. Roorkee. eeadmin@iriroorkee.res.in |
|
2 Sep, 2021 |
2 Sep, 2021 at
10:00 AM
|
16 Sep, 2021 at
03:00 PM
|
03/CC/Quotation/2021-22 |
Updation of IRI Roorkee Virtual Tour to Web Hosted Virtual Tour, Mark labels on arrows, Still image view where required, Indexing of important laboratories. |
Assistant Engineer-1
Computer Centre, Basic Research Unit
IRI, Roorkee info@iriroorkee.res.in |
|
26 Aug, 2021 |
26 Aug, 2021 at
10:00 AM
|
10 Sep, 2021 at
03:00 PM
|
02/AE-1/Quotation/2021-22 |
supply of items given in attached document as per specifications |
Assistant Engineer-I, Computer Centre
IRI, Roorkee info@iriroorkee.res.in |
|
23 Aug, 2021 |
23 Aug, 2021 at
10:00 AM
|
7 Sep, 2021 at
03:00 PM
|
04/PO-2/SPMU/NHP/2021-22 |
Supply and Installation of Lab Furniture for ICPOES in Water Quality Lab., Roorkee & Haldwani. |
Executive Engineer (Procurement Officer-2) SPMU, NHP, Irrigation Research Institute, Roorkee uttarkhandwrd@gmail.com |
|
23 Aug, 2021 |
23 Aug, 2021 at
10:00 AM
|
7 Sep, 2021 at
02:30 PM
|
03/PO-2/SPMU/NHP/2021-22 |
Supply and Installation of Lab furniture for GCMS in Water Quality Lab., Roorkee & Haldwani. |
Executive Engineer (Procurement Officer-2) SPMU, NHP, Irrigation Research Institute, Roorkee uttarkhandwrd@gmail.com |
|
26 Jul, 2021 |
16 Aug, 2021 at
03:00 PM
|
26 Aug, 2021 at
03:30 PM
|
01/PO-1/SPMU/NHP/2021-22 |
Supply, Installation, Testing, Commissioning computer, printer, etc. in SWIC Building in Roorkee under National Hydrology Project (NHP) |
Office of the Executive Engineer (Procurement Officer-1), SPMU, NHP, Irrigation Research Institute, Roorkee uttarkhandwrd@gmail.com |
|
3 Jul, 2021 |
27 Jul, 2021 at
03:30 PM
|
5 Aug, 2021 at
03:00 PM
|
03/SE(R)/NHP/e-Tender/2021-22 |
Supply, Installation, Testing, Commissioning and Maintenance of Digital Water Level Recorder (DWLRs) (Non-vented Pressure sensors) with Telemetry System in Piezometers for Ground Water Monitoring and Integrate with State Water Informatics Centre located at Roorkee under National Hydrology Project (NHP) in Uttarakhand State. |
Superintending Engineer, Research Circle, IRI, Roorkee uttarkhandwrd@gmail.com |
|
14 Jun, 2021 |
25 Jun, 2021 at
03:00 PM
|
7 Jul, 2021 at
03:00 PM
|
02/SE(R)/2021-22 |
Consulting Services for the Preparation of Detailed Project Report (DPR) for Fragile Slope Treatment and Sustainable Mitigation Works of Baliyanala, Nainital |
Superintending Engineer, Research Circle, Irrigation Research Institute, Roorkee
uttarkhandwrd@gmail.com |
|
8 Jun, 2021 |
3 Jul, 2021 at
03:30 PM
|
12 Jul, 2021 at
03:00 PM
|
01/SE(R)/NHP/e-Tender/2021-22 |
Supply, and Installation of IT and Audio Visual Equipment in SWIC Building at Roorkee under National Hydrology Project |
Superintending Engineer, Research Circle, Irrigation Research Institute, Roorkee
uttarkhandwrd@gmail.com |
|
9 Apr, 2021 |
1 May, 2021 at
03:30 PM
|
12 May, 2021 at
03:00 PM
|
Q. No.11/SE(R)/NHP/e-tender/2021 |
Drilling and installation of 66 nos. groundwater monitoring wells and construction of 66 nos. Protection works for DWLR telemetry system to monitor groundwater level and quality under National Hydrology Project (NHP) |
Superintending Engineer. Research Circle
IRI Roorkee uttarrkhandwrd@gmail.com |
|
10 May, 2021 |
10 May, 2021 at
10:00 AM
|
25 May, 2021 at
03:00 AM
|
Q.No. 02/CC/Quotation/2021-22 |
Creating Virtual Tour of IRI Roorkee, including all labs and offices, with menu by shooting, stitching and uploading (360 view images) on Google Maps and providing link for uploading on the institute website.
|
Office of the Assistant Engineer-1
Computer Centre, Basic Research Unit
Irrigation Research Institute, Roorkee-247667
info@iriroorkee.res.in |
|
22 Mar, 2021 |
7 Apr, 2021 at
03:30 PM
|
15 Apr, 2021 at
03:00 PM
|
Q.No.02/PO-1/SPMU/NHP/2020-21 |
Supply, Installation, Testing, Commissioning and Maintenance of Automatic Weather Station (AWS) at Bhimtal under National Hydrology Project (NHP) |
Executive Engineer (Procurement Officer-1), SPMU, NHP, Irrigation Research Institute, Roorkee uttarkhandwrd@gmail.com |
|
25 Mar, 2021 |
26 Mar, 2021 at
06:00 PM
|
26 Apr, 2021 at
03:00 PM
|
Q.No. 22/SE(R)/NHP/e-Tender |
Supply and Installation of IT and Audio Visual Equipment in SWIC (State Water Information Center) Building at Roorkee under National Hydrology Project (NHP) |
Superintending Engineer, Research Circle
IRI, Roorkee uttarkhandwrd@gmail.com |
|
20 Mar, 2021 |
22 Mar, 2021 at
05:30 PM
|
22 Apr, 2021 at
03:00 PM
|
Q.No. 03/PO-1/SPMU/NHP/2020-21 |
Supply, Installation, Testing, Commissioning and Maintenance of Air Conditioner in SWIC Building in Roorkee under National Hydrology Project (NHP) |
Executive Engineer (Procurement Officer-1) SPMU, NHP
Irrigation Research Institute, Roorkee-247667
uttarkhandwrd@gmail.com |
|
15 Mar, 2021 |
15 Mar, 2021 at
10:00 AM
|
5 Apr, 2021 at
03:00 PM
|
Q.N0.02/Paint Testing Lab/GWRU-1/IRI |
List of 14 Nos. Machines/Equipment's for Paint Test as per Attachment. |
Research Officer, Ground Water Research Unit-1
Irrigation Research Institute, Roorkee rogw1.iri@gmail.com |
|
10 Mar, 2021 |
12 Mar, 2021 at
02:30 PM
|
12 Apr, 2021 at
03:00 PM
|
21/SE(R)/NHP/RFP/2020-21 |
Preparation of Detailed Project Report (DPR) for Talghat Drinking Water & Water Body Creation Project, Pauri-Garhwal, Uttarakhand under National Hydrology Project (NHP) |
Superintending Engineer, Research Circle, Irrigation Research Institute, Roorkee uttarkhandwrd@gmail.com |
|
5 Mar, 2021 |
6 Mar, 2021 at
05:30 PM
|
6 Apr, 2021 at
03:00 PM
|
06/SE(R)/NHP/e-Tender/2020-21 |
Supply and Installation of Gas Chromatography Mass Spectra(GCMS) in Uttarakhand under National Hydrology Project. |
Superintending Engineer, Research Circle, IRI Roorkee uttarkhandwrd@gmail.com |
|
3 Mar, 2021 |
4 Mar, 2021 at
06:00 PM
|
3 Apr, 2021 at
03:00 PM
|
08/SE(R)/NHP/e-Tender/2020-21 |
Supply, Installation, Testing, Commissioning and Maintenance of
Real Time Data Acquisition System (RTDAS) in Uttarakhand under
National Hydrology Project (NHP)
|
Superintending Engineer
Research Circle
Irrigation Research Institute, Roorkee-247667 uttarkhandwrd@gmail.com |
|
1 Feb, 2021 |
5 Dec, 2020 at
03:00 PM
|
17 Feb, 2021 at
03:00 PM
|
21 |
Supply and inductive |
Superint e ,,s,s.,siuriri ffffffffff@gmail.com |
|
12 Mar, 2021 |
12 Mar, 2021 at
03:00 PM
|
15 Mar, 2021 at
03:00 PM
|
01/Paint Testing Lab/GWRU-1/IRI |
Various Machines/Equipment's for Paint Test according to Annexure. |
Research Officer
Ground Water Research Unit-1
Irrigation Research Unit
IRI, Roorkee rogw1.iri@gmail.com |
|
15 Feb, 2021 |
5 Mar, 2021 at
03:00 PM
|
17 Mar, 2021 at
03:00 PM
|
05/SE(R)/NHP/e-Tender/2020-21 |
Supply and Installation of Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) in Uttarakhand Under National Hydrology Project |
Superintending Engineer, Research Officer, Irrigation Research Institute uttarkhandwrd@gmail.com |
|
30 Jan, 2021 |
30 Jan, 2021 at
03:00 PM
|
2 Mar, 2021 at
03:00 PM
|
02/PO-1/SPMU/NHP/2020-21 |
Model Study for Rating of various Gates of Bhintal Lake, Naninital Utarakahnd under PDS HRS at Bahadrabad. |
Exexcutive Engineer, Procurement Officer-1, SPMU,NHP
Irrigation Research Institute, Roorkee uttarkhandwrd@gmail.com |
|
22 Jan, 2021 |
22 Jan, 2021 at
11:00 AM
|
11 Feb, 2021 at
03:00 PM
|
23/EE/PO-2/SPMU/NHP/2020-21 |
Nephelo Turbidity Meter as per Attachment. |
Executive Engineer, Procurement Officer-3. SPMU, NHP
IRI, Roorkee info@iriroorkee.res.in |
|
8 Jan, 2021 |
29 Jan, 2021 at
03:00 PM
|
11 Feb, 2021 at
04:30 PM
|
20/SE(R)/ e-Quotation/2020-21 |
SUPPLY AND INSTALLATION OF CORE CUTTING APPARATUS AT IRRIGATION RESEARCH INSTITUTE, ROORKEE |
SUPERINTENDING ENGINEER
RESEARCH CIRCLE
IRRIGATION RESEARCH INSTITUTE
ROORKEE-247667
E-mail: uttarkhandwrd@gmail.com |
|
8 Jan, 2021 |
29 Jan, 2021 at
03:00 PM
|
11 Feb, 2021 at
04:15 PM
|
19/SE(R)/ e-Quotation/2020-21 |
SUPPLY AND INSTALLATION OF ULTRSONIC PULSE VELOCITY TEST APPARATUS AT IRRIGATION RESEARCH INSTITUTE, ROORKEE |
SUPERINTENDING ENGINEER
RESEARCH CIRCLE
IRRIGATION RESEARCH INSTITUTE
ROORKEE-247667
E-mail: uttarkhandwrd@gmail.com |
|
8 Jan, 2021 |
29 Jan, 2021 at
03:00 PM
|
11 Feb, 2021 at
04:00 PM
|
18/SE(R)/ e-Quotation/2020-21 |
SUPPLY AND INSTALLATION OF PENETRATION RESISTANCE APPARATUS OR SETTING TIME OF CONCRETE AT IRRIGATION RESEARCH INSTITUTE, ROORKEE |
SUPERINTENDING ENGINEER
RESEARCH CIRCLE
IRRIGATION RESEARCH INSTITUTE
ROORKEE-247667
uttarkhandwrd@gmail.com |
|
8 Jan, 2021 |
29 Jan, 2021 at
03:00 PM
|
11 Feb, 2021 at
03:15 PM
|
17/SE(R)/ e-Quotation/2020-21 |
SUPPLY AND INSTALLATION OF DIGITAL DATA LOGGER (FOR ECO SOUNDER BATHY 500DF) AT IRRIGATION RESEARCH INSTITUTE, ROORKEE |
SUPERINTENDING ENGINEER
RESEARCH CIRCLE
IRRIGATION RESEARCH INSTITUTE
ROORKEE-247667
E-mail: uttarkhandwrd@gmail.com |
|
8 Jan, 2021 |
29 Jan, 2021 at
03:00 PM
|
11 Feb, 2021 at
03:30 PM
|
16/SE(R)/ e-Quotation/2020-21 |
SUPPLY AND INSTALLATION OF DIGITAL DGPS AT IRRIGATION RESEARCH INSTITUTE, ROORKEE |
SUPERINTENDING ENGINEER
RESEARCH CIRCLE
IRRIGATION RESEARCH INSTITUTE
ROORKEE-247667
E-mail: uttarkhandwrd@gmail.com |
|
8 Jan, 2021 |
29 Jan, 2021 at
03:00 PM
|
11 Feb, 2021 at
03:15 PM
|
15/SE(R)/ e-Quotation/2020-21 dated 08.01.2021 |
SUPPLY AND INSTALLATION OF DIGITAL CONCRETE BITUMEN EXTRACTOR ASPHAT CONTENT TESTER AT IRRIGATION RESEARCH INSTITUTE, ROORKEE |
SUPERINTENDING ENGINEER
RESEARCH CIRCLE
IRRIGATION RESEARCH INSTITUTE
ROORKEE-247667
E-mail: uttarkhandwrd@gmail.com |
|
8 Jan, 2021 |
29 Jan, 2021 at
03:00 PM
|
11 Feb, 2021 at
02:30 PM
|
14/SE(R)/ e-Quotation/2020-21 |
SUPPLY AND INSTALLATION OF Concrete ROCK SAW CORE CUTTING & GRINDING MACHINE AT IRRIGATION RESEARCH INSTITUTE, ROORKEE |
OFFICE OF THE SUPERINTENDING ENGINEER
RESEARCH CIRCLE
IRRIGATION RESEARCH INSTITUTE
ROORKEE-247667
uttarkhandwrd@gmail.com |
|
8 Jan, 2021 |
29 Jan, 2021 at
03:00 PM
|
11 Feb, 2021 at
02:45 AM
|
13/SE(R)/ e-Quotation/2020-21 |
SUPPLY AND INSTALLATION OF CONCRETE REBAR SCANNER AT IRRIGATION RESEARCH INSTITUTE, ROORKEE |
SUPERINTENDING ENGINEER
RESEARCH CIRCLE
IRRIGATION RESEARCH INSTITUTE
ROORKEE-247667
uttarkhandwrd@gmail.com |
|
8 Jan, 2021 |
29 Jan, 2021 at
03:00 PM
|
11 Feb, 2021 at
02:30 PM
|
12/SE(R)/ e-Quotation/2020-21 |
SUPPLY AND INSTALLATION OF UNIVERSAL TESTING MACHINE (100 KN) AT IRRIGATION RESEARCH INSTITUTE, ROORKEE |
SUPERINTENDING ENGINEER
RESEARCH CIRCLE
IRRIGATION RESEARCH INSTITUTE
ROORKEE-247667
uttarkhandwrd@gmail.com |
|
8 Jan, 2021 |
8 Jan, 2021 at
10:00 AM
|
11 Feb, 2021 at
02:30 PM
|
E-Tender Notice no. 12,13,14,15,16,17,18,19,20/SE(R)/e-Quotation/2020-21 |
Regrding Various Machines/Equipments |
Superintending Engineer, Research Circle. IRI, Roorkee uttarkhandwrd@gmail.com |
|
8 Jan, 2021 |
29 Jan, 2021 at
03:30 PM
|
9 Feb, 2021 at
03:00 PM
|
11/SE(R)NHP/e-Tender/2020-21 |
Drilling and instillation of 66 nos. groundwater monitoring wells and construction of 66 nos. Protection works for DWLR telemetry system to monitor groundwater level and quality under National Hydrology Project (NHP.) |
Superintending Engineer, Research Circle, Irrigation Research Institute, Roorkee
uttarkhandwrd@gmail.com |
|
29 Jan, 2021 |
1 Feb, 2021 at
03:00 PM
|
2 Mar, 2021 at
03:00 PM
|
10/SE(R)/NHP/e-Tender/2020-21 |
Electrical Fitting, Furnishing and Installation of other Accessories in SWIC Building, Roorkee under National Hydrology Project. |
Superintending Engineer Research Circle, Irrigation Research Institute, Roorkee uttarkhandwrd@gmail.com |
|
19 Dec, 2020 |
21 Dec, 2020 at
03:30 PM
|
22 Jan, 2021 at
03:00 PM
|
03/SE(R)/NHP/e-Tender/2020-21 |
Conducting River cross section and Topographical survey of River Ganga and its tributaries and Construction of RCC Bench Mark Pillar along these river under National Hydrology Project (NHP) in Uttarakhand. |
Superintending Engineer Research Circle, Irrigation Research Institute, Roorkee uttarkhandwrd@gmail.com |
|
23 Nov, 2020 |
23 Nov, 2020 at
10:00 AM
|
15 Dec, 2020 at
03:00 PM
|
Quotation Notice No. 14/EE/SPMU |
Regarding 01 Swift Dezire Taxi for government works under NHP |
Executive Engineer, Procurement officer-2, SPMU, NHP, IRI, Roorkee info@iriroorkee.res.in |
|
20 Nov, 2020 |
20 Nov, 2020 at
10:00 AM
|
2 Dec, 2020 at
03:00 PM
|
Quotation Notice No. 01 /BRU/Quotation/2020-21 |
Quotation for NABL Accredited Laboratories for the calibration of various items given in the annexure. |
Research Officer
Basic Research Unit
Irrigation Research Institute, Roorkee-247667 info@iriroorkee.res.in |
|
20 Nov, 2020 |
20 Nov, 2020 at
10:00 AM
|
2 Dec, 2020 at
03:00 PM
|
Quotation Notice No. 02/BRU/Quotation/2020-21 |
Quotation for NABL Accredited Laboratories for the calibration of the
various items mentioned in annexure. |
Research Officer
Basic Research Unit
Irrigation Research Institute, Roorkee-247667 info@iriroorkee.res.in |
|
20 Nov, 2020 |
20 Nov, 2020 at
10:00 AM
|
10 Dec, 2020 at
03:00 PM
|
Quotation Notice No. 02/Timber testing/GWRU-1/IRI |
Quotation for 14 Nos. Machine/Equipment's for Timber Test according to attched annexure. |
Research Officer, Ground Water Research Unit-1. IRI, Roorkee info@iriroorkee.res.in |
|
12 Nov, 2020 |
4 Dec, 2020 at
03:30 PM
|
15 Dec, 2020 at
03:00 PM
|
09/SE(R)/NHP/e-Tender/2020-21 |
Supply and installation of Acoustic Doppler Current Profiler (ADCP) in Uttarakhand under National Hydrology Project. |
Superintending Engineer, Research Circle, Irrigation Research Institute, Roorkee uttarkhandwrd@gmail.com |
|
12 Oct, 2020 |
12 Oct, 2020 at
03:00 PM
|
26 Oct, 2020 at
03:00 PM
|
Corrigendum to Quotation No. 01/GWRU-1/IRI dated 30-09-2020 |
Various 14 Nos. Machines/Equipment's for Timber Test |
Research Officer, Ground Water Research Unit-1, IRI, Roorkee
rogw1.iri@gmail.com rogw1.iri@gmail.com |
|
5 Oct, 2020 |
5 Oct, 2020 at
03:00 PM
|
7 Nov, 2020 at
03:00 PM
|
Re-tendering of e-Tender Notice No.06/SE(R)/NHP/e-Tender/2020-21 |
Supply and Installation of Gas Chromatography Mass Spectra(GCMS) in Uttarakhand under National Hydrology Project. |
Superintending Engineer, Research Circle, IRI, Roorkee uttarkhandwrd@gmail.com |
|
23 Sep, 2020 |
23 Sep, 2020 at
03:00 PM
|
8 Oct, 2020 at
03:00 PM
|
Quotation Notice No.09/EE/SPMU/NHP-2020 |
LED TV in the offoce of Nodal Officer, SPMU NHP, IRI, Rookree (Size 32") |
Executive Engineer, Procurement Officer-2, SPMU, National Hydrology Project, IRI, Roorkee uttarkhandwrd@gmail.com |
|
30 Sep, 2020 |
30 Sep, 2020 at
03:00 PM
|
25 Oct, 2020 at
03:00 PM
|
QUOTATION NOTICE No. 01/GWRU-1/IRI |
Various 14 Nos. Machines/Equipment's for Timber Test |
Research Officer, Ground Water Research Unit-1, IRI, Roorkee rogw1.iri@gmail.com |
|
19 Sep, 2020 |
19 Sep, 2020 at
03:30 PM
|
19 Oct, 2020 at
03:00 PM
|
Retender Notice for e-Tender Notice No.03/SE(R)/NHP/e-Tender/2020-21 |
Conducting River cross section survey and Toporaphical survey of river Ganga and its tributaries and Construction of RCC Bench Mark Pillar along these rivers under National Hydrology PROject (NHP) in uttarakhand State. |
Superintending Engineer, Research Circle, RI, Roorkee uttarkhandwrd@gmail.com |
|
17 Aug, 2020 |
17 Aug, 2020 at
03:00 PM
|
5 Sep, 2020 at
03:00 PM
|
452/MT-II/Q.N./2020-21 |
Hydraulic Tightness testing Machine for (Hydostatic Test) for G.I. Pipe, D.I. Pipe & P.V.C. Pipe.
Assembly for G.I. Pipes & D.I. Pipes (06 mm to 450 mm) as per IS Code 1239 (Part 1&2) and IS Code 8329.
|
Research Officer, Material testing Unit-II, IRI, Roorkee romt2.iri@gmail.com |
|
9 Sep, 2020 |
18 Sep, 2020 at
03:30 PM
|
25 Sep, 2020 at
03:00 PM
|
07/SE(R)/NHP/e-Tender/2020-21 |
Corrigendum no. 01 to Preparation of Detailed Project Report (DPR) of Khairna Barrage Drinking Water Project, Nainital, Uttarakhand under NHP |
Superintending Engineer, Research Circle, IRI, Roorkee uttarkhandwrd@gmail.com |
|
11 Sep, 2020 |
5 Sep, 2020 at
03:30 PM
|
12 Oct, 2020 at
03:00 PM
|
04/SE(R)/NHP/e-Tender/2020-21 |
Drilling and instillation of 66 nos. groundwater monitoring wells and construction of 66 nos. Protection works for DWLR telemetry system to monitor groundwater level and quality under National Hydrology Project (NHP.) |
Superintending Engineer, Research Circle, Irrigation Research Institute, Roorkee uttarkhandwrd@gmail.com |
|